Aurum Reports Strong Gold Drilling Results at Boundiali in Cote d’Ivoire

Published: 20 November 2026 Category: News
Aurum Reports Strong Gold Drilling Results at Boundiali in Cote d’Ivoire

Aurum Resources reports strong gold drilling results at Côte d’Ivoire's Boundiali project, supporting resource growth and targeting production in 2028.

Australian gold exploration and development company Aurum Resources has reported encouraging drilling results from the BST1 deposit at its flagship Boundiali Gold Project in Côte d’Ivoire, reinforcing the project's potential for further mineral resource expansion. The latest diamond drilling campaign has identified widespread gold mineralisation across multiple drill holes, strengthening confidence in the continuity of the mineralised system and highlighting opportunities for additional discoveries. The results represent another important step in Aurum's strategy to advance Boundiali towards commercial gold production while expanding its established mineral resource base.


The company completed 21 diamond drill holes at the BST1 deposit, covering a combined drilling distance of 6,070.78 metres. Of these, 19 holes intersected gold mineralisation with grades exceeding 0.2 grams per tonne (g/t), demonstrating the extensive distribution of gold-bearing geological structures within the deposit. Notably, 16 drill holes encountered at least eight separate mineralised intervals each, indicating the presence of multiple gold-bearing zones across the targeted drilling areas. These findings provide valuable geological information that could contribute to refining the project's mineral resource model and identifying additional areas for exploration.


A particularly significant aspect of the latest results is that gold mineralisation at BST1 remains open both along strike and at depth. This means that the full lateral and vertical extent of the gold-bearing structures has not yet been established, leaving considerable scope for future drilling to identify additional mineralised material. Continued exploration could help determine whether the known gold zones extend beyond their currently defined boundaries, potentially supporting future increases in the project's mineral resource estimate. However, further drilling, geological interpretation and resource modelling will be required to establish the economic significance of these extensions.


Aurum Resources Managing Director Dr Caigen Wang highlighted the positive implications of the drilling results, indicating that the findings demonstrate the continued exploration potential of the Boundiali Gold Project. The results support the company's ongoing strategy of systematically testing prospective mineralised zones while improving its understanding of the geological structures controlling gold distribution. Through this approach, Aurum aims to strengthen geological confidence, identify additional mineralisation and establish a more comprehensive foundation for future mine development planning.


The latest drilling results form part of an extensive exploration programme undertaken by Aurum across the Boundiali project area. During 2026, the company has completed more than 145,000 metres of drilling, reflecting a substantial commitment to mineral exploration and resource definition. Building on this momentum, Aurum is planning a further 180,000 metres of drilling in 2027. This ambitious programme is expected to focus on expanding known gold deposits, testing prospective exploration targets and improving the geological information required to support future mining operations.


Beyond exploration, Aurum is progressing the technical and economic studies necessary to transform Boundiali into a producing gold mine. The company expects to complete a Definitive Feasibility Study (DFS) during the first quarter of 2027. The study will play a critical role in assessing the project's technical viability, anticipated capital requirements, operating costs, processing infrastructure and potential economic returns. Its findings are expected to provide a more detailed basis for investment decisions and the next stages of project development.


The Boundiali Gold Project currently hosts a combined mineral resource estimate of approximately 5 million ounces of gold, positioning it as a substantial gold development asset within Côte d’Ivoire's expanding mining industry. Aurum is targeting first gold production during the first half of 2028, subject to successful feasibility assessments, project financing, regulatory approvals and construction progress. Achieving this milestone would mark the company's transition from gold exploration and development towards commercial production, potentially establishing Boundiali as an important contributor to the country's gold output.


Aurum's reported cash position of A$92.1 million provides financial capacity to support its ongoing exploration activities, feasibility studies and project development preparations. Maintaining a substantial cash reserve is particularly important for mineral exploration companies, given the significant expenditure associated with large drilling campaigns, technical assessments and pre-production activities. Nevertheless, the scale of funding ultimately required to construct and commission the proposed mining operation will depend on the project's final development specifications and feasibility study outcomes.


The continued advancement of the Boundiali Gold Project could have positive implications for Côte d’Ivoire's mining sector and wider economy. If successfully developed into a commercially viable operation, the project could contribute to increased national gold production, employment opportunities, government revenues, local procurement and investment in mining-related infrastructure. Its progress could also strengthen Côte d’Ivoire's attractiveness as a destination for international mineral exploration and mining investment. At the same time, the project's ultimate economic contribution will depend on factors including gold prices, development costs, environmental management, regulatory compliance and the successful conversion of mineral resources into economically recoverable reserves. Aurum's latest drilling results therefore represent a positive exploration development, although additional technical and financial milestones remain essential before the project's full commercial potential can be established.


Mini-Glossary


  • Diamond Drilling: An exploration technique that uses a diamond-tipped drill bit to extract cylindrical rock samples for geological analysis.
  • Gold Grade (g/t): The concentration of gold in rock, measured in grams of gold per tonne of material.
  • Mineralised Interval: A section of drilled rock containing measurable concentrations of economically interesting minerals.
  • Along Strike: The horizontal direction in which a geological formation or mineralised zone extends.
  • Open at Depth: Indicates that mineralisation continues beyond the deepest drilling completed and its lower boundary remains undefined.
  • Mineral Resource Estimate: An assessment of the quantity and grade of mineralisation within a deposit, based on geological evidence and technical analysis.
  • Definitive Feasibility Study (DFS): A detailed technical and economic evaluation used to assess whether a proposed mining project can be developed profitably.
  • Mineral Reserves: The economically mineable portion of a mineral resource, established through appropriate technical and economic assessments.
  • Commercial Production: The operational stage at which a mine produces minerals for sale on an ongoing commercial basis.